Shop drawing
Technical division, based on as-built drawings, prepare the stone plates in accepted scales, cross checking dimensions, coding the cut parts based on installation plan(s). Subsequently, this process improves the quality of executive operations and reduces waste materials.
Construction supervision
Supervision team, have complete control over the preparation and installation of the stone material(s) during the project implementation period, to ensure the best possible result, regardless of the complexity of the project.